Build the exact fence you want.
Every option below uses real materials stocked at Lowe's East Peoria #1956 (100 Riverside Dr, East Peoria, IL 61611). Pick your style, color, height, post, and gate — then send it over and we'll quote it on-site.


Build your wood fence the way you want it. Pick the species, board style, stain, post, and height — every option below is stocked locally at Lowe's East Peoria or Morton Buildings Supply.
Wood Type
Lowe's #226585 (5/8 x 5-1/2 x 6')· Lowe's East Peoria #1956View at Lowe's →
Board Style
Stain / Paint Color
Lowe's #50214 Olympic Maximum Clear· Lowe's East Peoria #1956View at Lowe's →
Post Style
Lowe's #41020 (4x4x8' .40 PT)· Lowe's East Peoria #1956View at Lowe's →
Height
Match the gate to your fence.
The gate is the part you actually touch every day. Pick the type, size, and hardware — we'll match material and color to whatever fence you choose above.
Gate Type
Width
Hardware Kit
Lowe's #126890 National Hardware V880· Lowe's East Peoria #1956View at Lowe's →
Latch Style
Lowe's #126900 National N109-407· Lowe's East Peoria #1956View at Lowe's →
From signed quote to finished fence.
A typical residential job runs 1-2 days once we're on site. Here's exactly what happens, in order.
Day 1 — Preparation
- Materials delivered & staged on site
- JULIE / 811 utility locate called and marked
- Local permit acquired same day (Morton, Pekin, Washington, East Peoria)
- Walk the line with you — confirm corners, gates, and any tear-out
Day 1-2 — Posts
- Holes augered to 30-42" depth (below Illinois frost line)
- Posts set in fast-setting Quikrete mix
- String lines pulled, every post checked level & plumb
Day 2-3 — Panels & Gates
- Panels or pickets installed, fasteners spec'd to manufacturer
- Gates hung level, hinges shimmed, latches set
- Self-closing hardware adjusted (if pool-code)
Final — Walkthrough
- All debris hauled off — yard left clean
- Final walkthrough with you, every gate tested
- Care & warranty info handed over
Typical install times
- Wood fence1-2 days
- Vinyl fence1-2 days
- Chain-link1 day
- Aluminum / ornamental1 day
- Farm fencing1-2 days
Weather, ground conditions (frozen soil, heavy clay, rock), gate count, and tear-out of an existing fence all affect timing. We'll give you a firm timeline at the on-site quote.
Real materials. Real stores. Right here.
Every option in this customizer is something we actually buy and install — most of it from Lowe's East Peoria #1956 on Riverside Drive, plus specialty items from Morton hardware suppliers. You can walk into the store with the SKU and see the exact product on the shelf.
- We support local: Morton, East Peoria, Pekin, Washington
- Lowe's part numbers shown so you can verify yourself
- Special-order items run through the Lowe's Pro Desk, ~1-3 weeks
- Concrete & bulk lumber sourced same-day for tight schedules
